ptac ashrae 90 1 2011 11 eer gas boiler

user-image

WNS series gas-fired (oil-fired) steam boiler

Product thermal capacity:1-20 t/h
Working pressure:0.7-2 Mpa

user-image

SZS series gas-fired (oil-fired) steam boiler

Product thermal capacity:10-100 t/h
Working pressure:2.5-9.8 Mpa

user-image

SZL series coal-fired steam boiler


Product thermal capacity:4-35 t/h
Working pressure:1.0-2.5 MPA

National Cost-effectiveness of ASHRAE Standard 90.1

2016-3-17 · Cost-effectiveness of ASHRAE Standard 90.1-2010-Cost Estimate (PNNL 2013). The second step in the cost estimate began by defining the types of costs to be collected. The cost estimates covered incremental costs for material, labor, construction equipment, commissioning, maintenance, and overhead and profit (OH&P).

lexie@zozen.com > Get A Quote >

Federal Register :: Energy Conservation Program:

(42 U.S.C. 6313(a)(6)(A)(ii)(I)) DOE investigated what efficiency levels higher than the ASHRAE 90.1 level are cost effective, rather than evaluating whether the ASHRAE 90.1 level is cost effective as a step above the current DOE PTAC standard. DOE revised the MIA analysis in section IV.J to include an additional set of product conversion costs

lexie@zozen.com > Get A Quote >

NJ SmartStart Buildings 2011 - Sustainable Jers

2011-11-7 · NJ SmartStart Buildings 2011 Opportunities for Commercial, Institutional, and Industrial Customers . m . • Refer to the ASHRAE 90.1 -2007 tables for Unit Power Density (UPD) baselines for various areas 0.75 to 1.0 11.0 EER $65 / ton > 1.0 10.0 EER $65 / ton Water Source Heat Pumps

lexie@zozen.com > Get A Quote >

2012-11-12 · • The total specified exterior lighting power cannot exceed ASHRAE 90.1-2010 allowances. The requirement of ASHRAE 90.1-2007, Section 9.1.4a, that light fixtures MUST be modeled with the maximum labeled wattage of the fixture is waived. Ex: A fixture with a 13 W screw-in CFL can be modeled as 13 W, plus any associated ballast powe

2012-11-12 · • The total specified exterior lighting power cannot exceed ASHRAE 90.1-2010 allowances. The requirement of ASHRAE 90.1-2007, Section 9.1.4a, that light fixtures MUST be modeled with the maximum labeled wattage of the fixture is waived. Ex: A fixture with a 13 W screw-in CFL can be modeled as 13 W, plus any associated ballast power.

lexie@zozen.com > Get A Quote >

AH

Our 300+ member companies produce more than 90 percent of the residential and commercial air conditioning, heating, water heating, and commercial refrigeration equipment made in North America.

lexie@zozen.com > Get A Quote >

Federal Register :: Energy Conservation Program fo

The Energy Policy and Conservation Act of 1975 (EPCA), as amended, directs the U.S. Department of Energy (DOE) to establish energy conservation standards for certain commercial and industrial equipment, including commercial heating, air-conditioning, and water- heating products. Of particular

lexie@zozen.com > Get A Quote >

Air Conditioning SEER/EER Degradati

2017-1-3 · Air Conditioning SEER/EER Degradation On the subject of SEER determination of air conditioner systems, NRELs APA booklet states: ^The default air-conditioner and heat-pump efficiencies in Table 8 may be used if the actual efficiency cannot be calculated or measured.

lexie@zozen.com > Get A Quote >

PTAC vs WLHP Annual Energy Consumption Energy

2015-5-7 · Per ASHRAE Table G3.1.1A the Baseline HVAC system is system 1 (PTAC with hot-water fossil fuel boiler) 9.3 to 11 EER. Selected HVAC system for the proposed design is WLHP (3 Ton High efficiency HP by Daikin, 15.9 EER and 4.83 COP) with 2 cell cooling tower, DOAS unit (9.8 EER) and 2 Boilers (0.92 Eff.).

lexie@zozen.com > Get A Quote >

NJ SmartStart Buildings 2011 - Sustainable Jers

2011-11-7 · NJ SmartStart Buildings 2011 Opportunities for Commercial, Institutional, and Industrial Customers . m . • Refer to the ASHRAE 90.1 -2007 tables for Unit Power Density (UPD) baselines for various areas 0.75 to 1.0 11.0 EER $65 / ton > 1.0 10.0 EER $65 / ton Water Source Heat Pumps

lexie@zozen.com > Get A Quote >

04_Building_HVAC_Requirements

04_Building_HVAC_Requirements___ 22 04_Building_HVAC_Requirements___。 Title24

lexie@zozen.com > Get A Quote >

Residential Measures - puc.state.pa.

2019-8-8 · Due to small sample size for GSHP in Pennsylvania Act 129 2018 Residential Baseline Study this value is lowest efficiency value from BEopt v2.8.0. PTAC and PTHP standards are based on requirements of ASHRAE 90.1-2016, Energy Standard for Buildings Except Low-Rise Residential Buildings, Table 6.8.1-4,

lexie@zozen.com > Get A Quote >

como instalar un boiler de gas natur

termotanque a gas natural boiler - ristoranteolei.it. Como instalar un termotanque a gas Tecnología de . Hace unos dias me ayudaron aqui a decidirme a instalar un termotanque, electrico por no haber gas natural en Misiones donde resido, ya que estoy .

lexie@zozen.com > Get A Quote >

Energy Code: Supporting Documents How to Gui

2019-11-20 · boiler schedule unit no. efficiency % gas gpm flue outlet size fuel input mbh output mbh min. oper gas pressure (in wg) b-1 600 534 16.5 89 60 8 gas/oil incremental wall air-cooled ac units unit no. model total cfm cooling heating capacity btu/h (1) eer lwt total capacity btu/h hot water ewt f f ptac -1 model 350 9,500 11.2 12,140 190 170

lexie@zozen.com > Get A Quote >

Federal Register :: Energy Conservation Program:

(42 U.S.C. 6313(a)(6)(A)(ii)(I)) DOE investigated what efficiency levels higher than the ASHRAE 90.1 level are cost effective, rather than evaluating whether the ASHRAE 90.1 level is cost effective as a step above the current DOE PTAC standard. DOE revised the MIA analysis in section IV.J to include an additional set of product conversion costs

lexie@zozen.com > Get A Quote >

the Potential for Gas Savings Design Strategi

2019-6-27 · Sponsored by Southern California Gas Company, Funded by California utility customers under the auspices of the California Public Utilities Commission December 15, 2016 Exploring the Potential for Natural Gas Savings from Passive Design Strategies

lexie@zozen.com > Get A Quote >

Air Conditioners, Furnaces, Heating & Cooling Brya

Bryant Heating & Cooling offers heating and air conditioning systems to meet your needs. Learn more about our products and find a dealer near you.

lexie@zozen.com > Get A Quote >

TRACE 700 Trane Commerci

Added the ability to use ASHRAE 90.1-2007 PRM fan power calculations with associated pressure credits. Added the ability to enable ASHRAE 90.1-2007 PRM calculations and disable building rotation for analysis purposes. Added units of watts per gpm for chilled water and condenser water pump types.

lexie@zozen.com > Get A Quote >

Chapter C4 Commercial Energy Efficiency - UpCod

Additions, alterations and repairs to existing buildings shall comply with one of the following: 1. The requirements of Sections C402, C403, C404, and C405; or 2. The requirements of Section C407; 1 or 3. The requirements of ASHRAE 90.1-2010, as amended by Appendix A of the New York City Energy Conservation Code. 1 In a rehabilitation project, the building parameters for the proposed design

lexie@zozen.com > Get A Quote >

ctashrae.o

2017-1-16 · 11.0 EER 12.3 IEER 10.0 EER 11.1 IEER 10.6 EER 11.8 IEER 10.8 EER 12.1 IEER 10.4 EER 11.6 IEER 9.3 EER 10.4 IEER Energy use limits (kWh per day) 0.56 x TDA + 0.43 Single zone Calculate pressure drop through each device and pipe segment in critical circuit at design conditions In individual heating and cooling systems with setback controls and DDC

lexie@zozen.com > Get A Quote >

New Products Showcased at the 2011 AHR Expo

New Products Showcased at the 2011 AHR Expo. February 21, 2011. with design efficiencies up to 11.6 EER. The unit can also be configured to deliver an integrated part load value (IPLV) up to 19.8 EER. use R-410A, and can exceed the requirements of ASHRAE 90.1 for efficiency. Multistack ASP75T Multistack () introduced

lexie@zozen.com > Get A Quote >

links:

© ZOZEN boiler Co., Ltd.. All rights reserved.